🚀Join Free - List Your Products & Reach Verified Global BuyersSign Up Free →
🚀List Your Products, Reach Global BuyersJoin Free

How to Get a Fuel Licence in Zimbabwe: Import and Retail

  • Published on : 13/11/2026
  • |
  • Last Updated on : 13/11/2026
How to Get a Fuel Licence in Zimbabwe: Import and Retail
B2B

Key takeaways

  • To obtain a fuel licence in Zimbabwe, incorporate a Private Limited Company, secure ZIMRA tax clearance and NSSA compliance, meet ZERA infrastructure standards for the specific licence category, and submit a complete application with fees via the ZERA e-licensing portal.
  • The Petroleum Act Chapter 13:22 and SI 71 of 2021 form the legal framework, empowering ZERA to issue licences, set safety standards, conduct inspections, and prosecute unlicensed fuel activities.
  • Applicants must be a locally incorporated Private Limited Company with a valid ZIMRA Tax Clearance Certificate (ITF 263), a current NSSA compliance certificate, and directors who provide certified IDs, proof of residence, and police clearances.
  • Import licence applicants for the 2026 cycle must demonstrate prior imports of at least 10 million litres of petrol and diesel combined in 2025 or any single year from 2022 to 2024, or own or manage at least three fuel retail sites.
  • Retail sites require double-walled underground tanks with interstitial monitoring, automatic tank gauging, overfill prevention, and a pressure decay test certificate from a ZERA-approved contractor.
  • A local authority zoning compliance letter, a Fire Brigade clearance certificate valid for one year, and an Environmental Management Agency EIA certificate are mandatory prerequisites for retail site approval.
  • The ZERA e-licensing portal requires account verification via a six-digit email code, upload of corporate documents in PDF under two megabytes each, completion of Form ZERA/FL/01 with site GPS coordinates and competent person details, and payment via the ZERA Paynow gateway.
  • ZERA inspectors verify ongoing compliance through checks on stock records, tank integrity tests every five years, annual SAZ pump calibration, annual Fire Brigade clearance renewal, and adherence to EIA certificate conditions.

Securing a fuel licence in Zimbabwe means navigating a multi-agency regime where the Zimbabwe Energy Regulatory Authority (ZERA) acts as the final gatekeeper, but only after corporate, tax, safety, and environmental boxes are ticked. This guide walks through the legal framework, the corporate and infrastructure prerequisites, the document checklist for each category, and the step-by-step workflow on the ZERA e-licensing portal, including the 2026 import licence volume threshold and the specific engineering standards for tanks, pumps, and forecourt safety.

You will learn how to structure your company to meet ZERA's eligibility rules, which technical drawings and certificates (SAZ calibration, Fire Brigade clearance, EMA EIA, zoning letter) must accompany a retail or wholesale application, how to complete Form ZERA/FL/01 without triggering manual review delays, and what ongoing compliance obligations, from annual pump recalibration to five-year tank integrity tests, keep a licence valid after issuance.

ZERA Fuel Licence Categories: Import, Retail & Wholesale Defined

Import Licence scope and volume thresholds

An Import Licence authorises the holder to bring petroleum products into Zimbabwe from outside the country. The licence covers activities such as arranging international procurement, managing customs clearance at designated ports of entry, and taking delivery of fuel into bonded storage. Import licensees must demonstrate access to storage infrastructure that meets ZERA safety and environmental standards before the product can move into domestic channels. The licence does not automatically permit retail sales to end consumers; a separate Retail Licence is required for that activity.

Retail Service Station vs Wholesale Depot distinctions

A Retail Licence allows the holder to sell petroleum products directly to consumers at a service station or retail outlet. The premises must display approved signage, operate calibrated dispensing pumps, and maintain safety equipment such as fire extinguishers and spill containment kits. A Wholesale Licence authorises the sale of fuel in bulk to other licensed businesses, such as retailers, industrial consumers or other wholesalers, from a depot or storage facility. Wholesale operations focus on large-volume transfers rather than individual customer transactions, and the site must have bulk storage tanks and loading infrastructure suited to tanker movements.

Blending, Storage and Transport licence requirements

A Blending Licence permits the mixing of petroleum products or additives to produce a finished fuel that meets national quality specifications. Storage Licences cover facilities that hold fuel for third parties or for the licensee's own later distribution, with tank construction, bunding and ventilation standards set by ZERA. Each category carries separate application criteria, and a single business may need multiple licences if it performs more than one activity.

Licence TypePrimary ActivityTypical CustomerKey InfrastructureRetail Sales Allowed
ImportBringing fuel into ZimbabweWholesalers, depotsBonded storage, customs clearanceNo
WholesaleBulk fuel distributionRetailers, industrial usersDepot, bulk tanks, loading gantryNo
RetailDirect sale to consumersMotoring publicService station, pumps, forecourtYes
BlendingMixing fuel products/additivesWholesalers, retailersBlending plant, quality labNo
StorageHolding fuel for othersImporters, wholesalersBunded tanks, venting, fire protectionNo

ZERA's licence categories appear in the Petroleum Act and its licence fees regulations, and each licence specifies the exact products, volumes and locations covered. A company that imports fuel and also operates a service station must hold both an Import Licence and a Retail Licence, because the permissions do not overlap. Applicants should match their licence category to their actual business model before submitting documents, as ZERA assesses infrastructure against the specific activity named in the application.

Legal Framework: Petroleum Act and SI 71 of 2021 Key Provisions

Fuel licensing in Zimbabwe is governed primarily by the Petroleum Act Chapter 13:22, which provides the legal basis for issuing, suspending and cancelling licences. The Zimbabwe Energy Regulatory Authority (ZERA) is established by the Energy Regulatory Authority Act [Chapter 13:23] (2011) as the body responsible for administering these licences. The Energy Regulatory Authority Act and the Petroleum Act provide the enforcement powers that allow inspectors to enter premises, inspect records and take action against unlicensed fuel activity. Together, these instruments create the statutory regime under which all import, wholesale, retail, blending, storage and transport licences are granted and regulated. ZERA processed nearly 1000 licence applications in the 2025 licensing cycle according to Ziyah News (citing ZERA) source.

Petroleum Act Chapter 13:22 core mandates

The Petroleum Act Chapter 13:22 gives ZERA the mandate to regulate the importation, exportation, sale and distribution of petroleum products in Zimbabwe. It prohibits any person from engaging in these activities without a valid licence issued by the Authority. The Act also empowers ZERA to set standards for fuel quality, safety and environmental protection at licensed premises. Any person who contravenes the licensing requirements commits an offence and may face prosecution, fines or cancellation of any existing licence.

SI 71 of 2021 licensing conditions

It outlines the circumstances under which ZERA may refuse an application, such as inadequate infrastructure, false declarations or failure to meet safety standards. The instrument also requires licensees to keep proper records of fuel receipts, sales and stock movements, and to make those records available to inspectors on request. These conditions apply uniformly to import, wholesale and retail applicants.

ZERA Act enforcement powers

The Energy Regulatory Authority Act authorises the Authority to monitor compliance through inspections, audits and investigations of licensed and unlicensed premises. Inspectors may examine storage tanks, dispensing equipment, financial records and import documentation to verify that operations match the licence scope. Where violations are found, ZERA can issue improvement notices, suspend a licence temporarily or refer the matter for criminal prosecution. These enforcement powers mean that holding a licence is only the first step; ongoing compliance is a legal obligation for as long as the business operates. Seventy-three liquid fuel and 136 LPG retail sites were closed and prosecuted for operating without petroleum retail licences between January and July 2024 according to Pindula News source.

Eligibility and Corporate Pre-Requisites for Applicants

Applicants must be a locally incorporated Private Limited Company registered with the Companies Registry under the Companies and Other Business Entities Act. The entity must hold a valid ZIMRA Tax Clearance Certificate (ITF 263) confirming all corporate tax, VAT and PAYE obligations are current. Directors and shareholders must submit certified copies of national identity documents, proof of residence and police clearance certificates. For the 2026 licensing cycle, import licence applicants must show prior imports of at least 10 million litres of petrol and diesel combined in 2025 or in any single year from 2022 to 2024, or own or manage at least three fuel retail sites according to Ziyah News (citing ZERA) Ziyah News.

Private Limited Company registration (Companies Registry)

A Private Limited Company registration is the baseline corporate vehicle accepted by ZERA for all fuel licence categories. The certificate of incorporation must reflect a share capital structure that meets the minimum financial thresholds implied by the licence type sought. The company's memorandum and articles of association must explicitly include petroleum import, wholesale or retail as a core business object. The registered-address notice is a separate form. Any changes to directors or shareholding after incorporation must be reflected in the current filings with the Companies Registry before the ZERA application is submitted.

ZIMRA Tax Clearance and NSSA compliance

A valid ZIMRA Tax Clearance Certificate (ITF 263) is non-negotiable and must be dated within the application window. It confirms that the applicant has no outstanding corporate income tax, value added tax or PAYE liabilities. ZERA cross-references these documents with the respective authorities during vetting. Expired or provisional clearances result in immediate application rejection, so applicants should renew both certificates well ahead of the submission date.

Indigenisation and Economic Empowerment Act considerations

Since the 2018 amendment the 51% indigenisation threshold applies only to diamonds and platinum. It does not apply to fuel licensing. ZERA evaluates company structures on a case-by-case basis alongside broader economic empowerment objectives. Applicants with foreign technical partners must clearly disclose the partnership terms and ensure they do not circumvent the spirit of the Act.

Site and Infrastructure Standards: Tanks, Pumps, Safety and Zoning

Every retail site must meet strict engineering and safety standards before ZERA grants a licence. The forecourt layout must allow safe vehicle movement, emergency access and clear separation of loading and dispensing zones. Underground storage tanks must be double-walled fiberglass or steel with cathodic protection, equipped with automatic tank gauging and leak detection systems. Pumps must be calibrated by a Department of Weights and Measures (Trade Measures, Ministry of Industry and Commerce) accredited verifier and display valid calibration seals. Fire extinguishers, sand buckets, spill kits and clearly marked emergency shut-off switches are mandatory at each dispensing island. The local authority must issue a zoning compliance letter confirming the site is designated for petroleum retail. The Environmental Management Agency (EMA) requires an Environmental Impact Assessment (EIA) certificate before construction begins. The Fire Brigade conducts a final inspection and issues a clearance certificate confirming hydrant access, foam capacity and escape routes. These approvals must be current and submitted as a complete pack with the ZERA application.

Minimum tank capacity and underground tank specifications

ZERA mandates a minimum total underground storage capacity for a new retail site, typically split across three compartments for petrol, diesel and kerosene or ethanol blend. Tanks must be double-walled fiberglass reinforced plastic or protected steel with interstitial monitoring. Each tank requires an automatic tank gauge console, overfill prevention valves and positive shutdown. Manholes must be watertight with spill containment buckets. Piping must be double-walled with sump sensors at every junction. A pressure decay test certificate from a ZERA-approved contractor is required before backfilling.

SAZ pump calibration and forecourt safety signage

Every dispensing pump must hold a current calibration certificate issued within the last twelve months. The verification seal must be intact and visible on the pump face. Forecourt signage includes mandatory no-smoking symbols, mobile phone prohibition notices, emergency assembly point markers and product identification labels on each hose. Reflective bollards must protect pump islands and tank fill points. Lighting must meet the minimum lux levels specified in the petroleum regulations for night operation. All signage must be in English and Shona or Ndebele as appropriate for the location.

Fire Brigade clearance and EMA EIA certificate requirements

The local Fire Brigade issues a clearance certificate after inspecting hydrant pressure, foam concentrate stock, fire blanket placement and the accessibility of emergency exits. The Environmental Management Agency requires a full Environmental Impact Assessment for new sites or major upgrades. The EIA report must cover soil contamination risk, groundwater protection, vapour recovery provisions and waste management plans for sludge and interceptors. EMA issues a certificate with conditions that become binding licence terms. Both documents must be originals or certified copies when submitted to ZERA.

Infrastructure ElementMinimum StandardCertification BodyValidity PeriodKey Compliance Document
Underground Storage TanksDouble-walled with interstitial monitoringZERA approved contractorPressure test at commissioning, integrity test every 5 yearsTank pressure decay test certificate
Dispensing PumpsCalibrated, seals intact, one pump per product per island minimumDepartment of Weights and Measures12 monthsCalibration certificate and seal
Fire SafetyHydrant access, 6 percent foam concentrate, extinguishers at 15m intervalsLocal Fire Brigade12 monthsFire Brigade clearance certificate
EnvironmentalEIA approved, vapour recovery stage 1 and 2, interceptor maintenance logEnvironmental Management AgencyProject life, annual auditEMA EIA certificate
ZoningLocal authority designation for petroleum retailRelevant Municipal Council or Rural District CouncilPermanent unless rezonedZoning compliance letter

The table summarises the five critical infrastructure pillars ZERA inspectors verify before a retail licence is issued. Each row represents a separate regulatory gatekeeper with its own certification body and renewal cycle. The tank pressure decay test is a one-time commissioning requirement but integrity testing recurs every five years. Pump calibration is the most frequent renewal at twelve months and must align with the Fire Brigade and EMA annual audits. A missing or expired document in any column halts the application until the gap is closed. Operators should calendar these expiry dates at least sixty days in advance to avoid a compliance gap that could trigger a licence suspension.

Step-by-Step Application Guide: ZERA e-licensing Portal Walkthrough

Portal account creation and entity verification

Start by visiting the ZERA e-licensing portal and selecting the new registration option for a petroleum licence. Enter the company name exactly as it appears on the certificate of incorporation and provide the CR number, registered physical address and a valid email address that will receive the one-time verification link. The system sends a six-digit code to that email; enter it within fifteen minutes to activate the account. Once logged in, upload the certified copies of the certificate of incorporation, CR14, CR6 and the memorandum and articles of association in PDF format not exceeding two megabytes each. The portal cross-references the CR number with the Companies Registry database and flags any mismatch for manual review which can add five working days to the timeline.

Form ZERA/FL/01 field-by-field guidance

Navigate to the licence application module and select the appropriate category from the dropdown menu such as petroleum import, retail or wholesale. Complete every mandatory field including the proposed site GPS coordinates, tank capacity in litres, pump count and the name of the appointed competent person who holds a valid ZERA safety certificate. For import applicants the form requires the bonded warehouse customs code and the intended annual import volume in litres. ZERA opened applications for 2026 fuel import licences at a reduced fee of US$15,000 according to Ziyah News. Attach the site layout plan, fire clearance certificate, EMA EIA certificate and zoning compliance letter before proceeding to the declaration page where the director must tick each compliance statement and apply a digital signature.

Document upload standards and payment confirmation

All supporting documents must be scanned in colour and saved as PDF or JPEG files named according to the convention DocumentType_CompanyName_Date for example FireCert_ABCPetroleum_20240601 according to Pindula News (2012, 2023). The portal rejects files larger than five megabytes or those with special characters in the filename. After the final upload click the submit button which generates a unique application reference number beginning with ZERA/FL. A payment confirmation receipt with a transaction ID appears immediately; download and save it because the portal does not allow re-printing after the session ends. The application status changes to Under Review within twenty-four hours and an automated acknowledgement email is sent to the registered address.

Document Checklist by Licence Type: Import vs Retail vs Wholesale

Corporate and director particulars checklist

Each director must submit a certified copy of their national ID or passport, a police clearance certificate issued within the last six months and a curriculum vitae demonstrating relevant petroleum experience.

Site-specific technical drawings and lease agreements

Retail and wholesale applicants must provide a site layout plan drawn to scale showing tank positions, pump islands, canopy dimensions, fire hydrant locations and the safety zone distances to property boundaries. A certified lease agreement or title deed proving tenure of at least five years is mandatory and the document must be stamped by the Ministry of Lands. The local authority zoning confirmation letter must explicitly state that the stand is designated for petroleum retail or wholesale use. Import licence applicants who will not operate a physical forecourt submit the bonded warehouse layout instead including the customs warehouse licence number, security fence specifications and the vapour recovery system design.

Importer-specific supply contracts and customs bonds

A customs bond guarantee from a registered insurance company covering the full duty liability of the projected annual import volume is required before ZERA issues the licence. The applicant must also present the CD1 import declaration form template pre-approved by ZIMRA and a letter of credit facility confirmation from their bank showing available limits. Wholesale applicants who source locally need a supply contract with a licensed importer or refinery while retail applicants require a supply agreement with a licensed wholesaler.

DocumentImport LicenceRetail LicenceWholesale Licence
Certificate of IncorporationRequiredRequiredRequired
CR6 & CR14RequiredRequiredRequired
Tax Clearance (ZIMRA)RequiredRequiredRequired
Director IDs & Police ClearanceRequiredRequiredRequired
Competent Person CV & CertificateRequiredRequiredRequired
Site Layout PlanBonded WarehouseForecourt LayoutDepot Layout
Lease/Title Deed (5+ years)Warehouse LeaseForecourt LeaseDepot Lease
Zoning Confirmation LetterIndustrial/WarehousePetroleum RetailPetroleum Wholesale
Fire Brigade ClearanceRequiredRequiredRequired
EMA EIA CertificateRequiredRequiredRequired
Supply AgreementForeign Refinery/TraderLicensed WholesalerLicensed Importer/Refinery
Customs Bond GuaranteeRequiredNot RequiredNot Required
CD1 Form TemplateRequiredNot RequiredNot Required
Bank Letter of Credit ConfirmationRequiredNot RequiredNot Required
Paid-up Capital Proof (: see official tariffk+)RequiredNot RequiredRequired

The table maps every mandatory document to the three licence categories so you can see at a glance which items are shared and which are unique. All three licences demand the core corporate pack, director particulars, competent person credentials, site-specific layouts, tenure proof, zoning, fire and EMA clearances. The import column carries the heaviest burden with customs bonds, CD1 templates, letter of credit confirmations and foreign supply contracts that retail and wholesale applicants do not need. Use this matrix to build your document folder before logging into the portal so that no upload is missed and the application moves straight to inspection without a request for further information.

Top 10 Reasons Applications Fail and How to Fix Them

Applications fail most often because applicants underestimate the documentary rigour required by ZERA. Each rejection reason below maps to a specific statutory requirement and the corrective action is a procedural step not a negotiation. Addressing these points before submission reduces the risk of a formal rejection letter which restarts the clock on the application timeline.

Environmental Impact Assessment deficiencies

Environmental Impact Assessment deficiencies arise when the report omits site specific groundwater vulnerability mapping, lacks a quantitative spill dispersion model or fails to include a decommissioning plan with cost estimates. The Environmental Management Agency rejects generic reports that do not reference the exact GPS coordinates of each tank and pump island. Applicants must engage a registered environmental consultant who conducts baseline soil and water sampling before the EIA scoping report is submitted. The consultant must present the final EIA at a public hearing attended by the local authority and community representatives. A certificate of adequacy from EMA is a prerequisite for the ZERA site inspection.

Infrastructure non-compliance and safety gaps

Infrastructure non-compliance and safety gaps include underground tanks without double wall construction or leak detection probes, missing emergency shut off valves at each dispenser, inadequate fire extinguisher placement and absent bund walls. ZERA inspectors verify tank calibration certificates issued by an accredited metrology laboratory within the previous twelve months. Pump meters must display a current verification stamp from the Ministry of Industry and Commerce. The site must have a dedicated emergency assembly point, clearly marked evacuation routes and a functional foam firefighting system for forecourt areas. Rectification requires physical modification and a re-inspection booking.

Corporate document expiry and ownership discrepancies

Corporate document expiry and ownership discrepancies occur when the certificate of incorporation, CR6, CR14 or tax clearance certificate presented are older than three months at the time of submission. Shareholding structures in the Companies Registry extract must match the beneficial ownership declaration submitted to ZERA exactly. Any director changes not yet reflected in the CR6 cause an automatic query. Applicants must obtain fresh documents from the Companies Registry and ZIMRA within the two week window before lodging the application. A certified copy of the memorandum and articles of association showing the object clause permits petroleum trading is mandatory.

Rejection CategoryPrimary CauseRegulatory BodyRemedial TimelineRe-inspection Required
Environmental Impact Assessment deficienciesMissing groundwater mapping or spill modelEMA30-60 days for revised studyYes
Infrastructure non-compliance and safety gapsTank or pump certification lapsedZERA14-30 days for physical fixesYes
Corporate document expiry and ownership discrepanciesRegistry extracts older than three monthsCompanies Registry / ZIMRA7-14 days for fresh documentsNo
Zoning mismatchSite not designated for hazardous retailLocal Authority60-180 days for rezoningYes
Fire clearance absenceNo valid fire brigade certificateFire Brigade7-21 days for inspectionYes
Forecourt layout non-conformanceSetback distances violatedZERA / Local Authority30-90 days for redesignYes
Insurance policy gapsPublic liability cover below thresholdZERA7 days for policy endorsementNo
Staff competency gapsNo certified petroleum handlers on payrollZERA14-30 days for trainingNo
Product quality plan missingNo sampling and testing protocolZERA / SAZ14 days for documented planNo
Fee payment errorsIncorrect amount or reference usedZERA1-3 days for reconciliationNo

The table summarises the ten most frequent rejection categories with the primary cause, the regulatory body that flags the issue, the typical remedial timeline and whether a physical re-inspection is mandatory. Environmental and infrastructure items carry the longest remediation windows because they require specialist consultants and physical construction work. Corporate document and fee payment errors are resolved fastest because they involve only administrative replacement. Zoning mismatches are the most disruptive often requiring a formal change of land use application through the local authority which includes public consultation periods. Applicants should sequence their preparation so that zoning confirmation and EMA certification are secured before investing in tank installation.

Trade Petroleum Products on Global Trade Plaza: petroleum oil related products on Global Trade Plaza, merey 16 crude oil, diesel fuel en590 euro 5 10ppm netherlands, heavy fuel oil hfo, jet fuel a1 and jet a.

Related reading: Peanut Oil Export Regulations In EU - A Complete Export Guide, Sunflower Oil Export To Middle East - A Complete Export Guide.

Conclusion

To secure a fuel licence in Zimbabwe, incorporate a Private Limited Company, obtain current ZIMRA and NSSA certificates, and prepare the site-specific infrastructure and safety documents that match your chosen licence category. Submit a complete application through the ZERA e-licensing portal with accurate GPS coordinates, competent person details, and payment via the Paynow gateway to avoid manual review delays.

After issuance, maintain compliance by renewing annual Fire Brigade clearance and SAZ pump calibration certificates, conducting five-year tank integrity tests, and keeping stock records available for ZERA inspections. Start by verifying your corporate documents with the Companies Registry and ZIMRA, then create your portal account at the ZERA e-licensing platform.

Frequently Asked Questions

How to Get a Fuel Licence in Zimbabwe: Import and Retail online?

Applicants can complete registration, submit documents, pay fees and track status through the ZERA portal. Certain steps such as site inspections and original certified document verification still require in-person engagement. Engage a local consultant to manage the physical follow-up where needed.

How to apply for fuel licence in Zimbabwe?

Incorporate a Private Limited Company, obtain a valid ZIMRA Tax Clearance (ITF 263) and NSSA compliance certificate, then compile the ZERA application form with certified director IDs, police clearances, proof of residence, and a detailed business plan. Secure site-specific approvals including local authority zoning, EMA EIA certificate, Fire Brigade clearance, and SAZ pump calibration before submitting the complete pack to ZERA for vetting and site inspection.

What are the requirements for a fuel import licence in Zimbabwe?

Applicants must demonstrate access to bonded storage meeting ZERA standards, provide proof of prior import volume of at least 10 million litres of petrol and diesel combined in 2025 or any single year from 2022 to 2024, or ownership of at least three retail sites. A valid ZIMRA Tax Clearance, NSSA compliance, company registration documents, and director particulars are mandatory alongside the completed ZERA import licence application form.

What are the requirements for a retail service station licence in Zimbabwe?

The site must have a minimum 45,000-litre total underground storage capacity in double-walled tanks with automatic gauging and leak detection. Required approvals include local authority zoning confirmation, EMA Environmental Impact Assessment certificate, Fire Brigade clearance, and SAZ pump calibration certificates. The forecourt must display safety signage, spill kits, fire extinguishers, and emergency shut-off switches at every dispensing island.

ZERA fuel licence application form download?

The official ZERA fuel licence application forms are available for download from the ZERA website under the "Licensing" or "Downloads" section, or can be collected physically from ZERA regional offices. Ensure you select the correct form matching your licence category such as Import, Retail, Wholesale, Blending, Storage, or Transport as each has distinct annexures.

How long does it take to get a ZERA fuel licence?

Delays often arise from incomplete documentation, failed site inspections requiring remedial work, or backlogs in Fire Brigade and EMA certification. Import licences may take longer due to volume verification requirements.

ZERA fuel licence renewal requirements?

Renewal requires a valid ZIMRA Tax Clearance (ITF 263), current NSSA compliance certificate, proof of licence fee payment, and a declaration that site infrastructure and ownership details remain unchanged. ZERA may conduct a compliance inspection focusing on tank integrity tests, pump calibration records, and monthly return submission history before issuing the renewed licence.

Can a foreigner own a fuel company in Zimbabwe?

Full foreign ownership of the licence holder is generally not permitted.

ZERA monthly fuel return form?

Licensed fuel businesses must submit monthly fuel returns using the ZERA prescribed template, detailing opening stock, receipts, sales, closing stock, and losses for each product grade. The form is available from ZERA offices or the licensee portal and must be submitted by the seventh day of the following month. Accurate returns are a licence condition; discrepancies trigger inspections.

Fuel storage tank regulations Zimbabwe?

Underground tanks must be double-walled fiberglass reinforced plastic or cathodically protected steel with interstitial monitoring, automatic tank gauging, overfill prevention, and positive shutdown. Piping must be double-walled with sump sensors at junctions. A pressure decay test certificate from a ZERA-approved contractor is mandatory before backfilling, and tanks require regular integrity testing.

Environmental impact assessment for petrol station Zimbabwe?

An Environmental Impact Assessment (EIA) certificate from the Environmental Management Agency (EMA) is mandatory before construction of any petrol station begins. The EIA process includes a scoping report, public consultation, and submission of an Environmental Management Plan. EMA reviews the potential impact on soil, groundwater, air quality, and community safety before issuing the certificate required for the ZERA application.

Penalties for selling fuel without a licence in Zimbabwe?

The Petroleum Act Chapter 13:22 criminalises unlicensed fuel activity, exposing offenders to prosecution, substantial fines, and potential imprisonment. ZERA inspectors may seize illegal stock, seal premises, and refer cases for criminal prosecution. Directors of offending companies face personal liability, and any existing licences held by related entities may be suspended or cancelled as a regulatory sanction.

Sources

Tags

  • #how to get a fuel license in zimbabwe

About Author

Author Name : Global Trade Plaza
Bio : Global Trade Plaza is a verified B2B marketplace connecting exporters, importers, wholesalers, and manufacturers worldwide. Our team writes practical guides on international trade, sourcing, and compliance, drawing on daily work with verified businesses across 50+ countries.
Reviewed by : Ronit Seth, Trade Content Expert at Global Trade Plaza
Ronit reviews market and category content at Global Trade Plaza, covering how product categories differ by origin and what that means for buyers.